48
Alternately in the same course Laid as Flemisû bond, and with 6 to 1 Portland
backed ap Cement concrete as the work proceeds. - Clean rubble stone Should be introduced into the backing and properly incorporated "Therewith. The coping would be
the same as
On
Fig: 2.
LU
proposed I gather from the Memorandum that the traffic along the Praya is Chickly pedestrian ponies and light carriages however are greatly used by European merchants especially along Praya Central - Bobrovide for this where traffic and to prevent the lime concrete, from being worked at, the
2b, wadway Should be bitchsaved with granite sels
say
Say
8 inches in depth. so as
ما
form a carriage track as feet in width as shewn on Fig:,; these sets should rest son a bed d lime concrete oins in thickness and should be Well kammed and the points run in solid wiz lime grout. In this manner an excellent roadway would be formed cqual to all the requirements of the traffic
WIZ
"Along that sortion of the new wall where the soundations do not restabon rock the
Show to be footings
protected from the action of rebound by an Apron 10 beet in Width formed of blocks of granite cloven approximative. Square but not-dressed, and Set with moderality close younis. -
From the Oriental
But Steps to Wardley Streck
No comments yet.
Private notes are available after approval.